The popular drama that hit tvN in December 2020.
MR. Queen was revealed on Netflix.
There was a lot of controversy when it was aired,
The last movie had a rating of 17.4%.
It's a drama that I watched three years ago.
Looking at it again, it's quite fun.
For those who watched "MR. Queen,"
Character relationship chart, episode information, ratings, ending, ot information,
I'll leave a preview of the official video.
Information about MR. Queen
In an accident, the soul of Korea's representative bluffing man is buried.
Kim So-yong (Shin Hyesun), who has a new level of energy,
Between the two-faced king Cheoljong (Kim Jung-hyun),
a soul-depart
Broadcasting year: December 12, 2020 to February 14, 2021.
Cast: Kim Jung-hyun, Shin Hye-sun, Seol In-ah, Nine Woo, Bae Jong-ok, Kim Tae-woo.
Information on a few episodes: 20 episodes in total.
Highest viewer rating: 17.4%.
Genre: Historical drama, fantasy, comedy romance
OTT Streaming: Tving, Netflix
Character relationship chart of MR.Queen


The role of Kim So-yong/ Shin Hye-sun
There was never a moment when I didn't try for the Yong-eun family's dream.
For his mother, who died giving birth to him, to his father,
She thought she was a good son, so she did her best.

Role of Jang Bong Hwan / Choi Jin Hyuk
the chief chef of the Blue House
With the motto, "Winning is on my side."
He's quick to change his attitude and doesn't care about what others think.
A wild horse-like man who runs wild without knowing the world is scary.
But he was framed and he was on the veranda of the apartment.
As he falls, he becomes possessed by Kim So-yong's body.

the role of Choi Sang-gung / Cha Cheong-hwa
Mama~ No, you can't. Not all of them. "
He is a nagger who tells Kim So-yong that he can't be tapped as a court lady who assists Kim So-yong. Suddenly, I am getting more and more worried because of the unpredictable use of wild horses.
be on the side of the good

Hong Yeon / Chae Seo Eun
"I'm going to die if you tell me to".
It is a kind of body type that was brought from the head house dedicated to single use.
A woman who always smiles and can do everything.
He is a coward and a loyal servant.

Cheoljong (Lee Won-beom) Role / Kim Jung-hyun
a two-faced king
He acts like a fool on the outside, but on the inside,
possess the qualities of a monarch
He is incapable of doing anything as his subjects want him to do.
I'm afraid of dying as a king.k.a. king. He's secretly reforming himself, hiding the truth.
I'm dreaming. I'm facing my destiny and I'm not going to give in easily.
He is a man of strength.

Youngpyeong-gun/ Yoo Mingyu
Cheoljong, brother and captain of the Golden Guard.
He's the captain of the Golden Guard who protects his half-brother Cheoljong's bed.
a gentleman who cares for his younger brother Later on, because of my values,
They are at odds with Cheoljong.

The role of Hongbyeolgam / Lee Jaewon
"It's annoying, but I have to save the country."
A friend and hidden helper of Cheoljong's Ganghwa-do days!
He is a person who promotes reform with Cheoljong.
I am close to Kim Hwan of Ansong Kim family for some reason.

the role of Queen Sunwon / Bae Jongok
" What I want to stay young is to stay strong. "
a person who is more powerful and powerful than the king of Joseon
She is behind her brother Kim Jwa-geun.

The role of Kim Jwa-geun/ Kim Tae-woo
"You need more power to maintain the status quo."
He is the younger brother of Queen Sunwon.
He pretends not to know, but he knows Kim Byung-in's mind.

The role of Kim Byung-in/ Na in-woo
" I've always seen you. "Even when I can't see you".
When I was young, I was adopted by Kim Jwa-geun.
My cousin and I have become friends.
Unlike his shadowed self, he became fond of bright uses.
Seeing Yong and Cheoljong turn into a friendly relationship,
be seized with jealousy

The role of Kim Moon-geun / Jeon Bae-Soo
the Father of Use
He is so materialistic that his nickname is pomul Buwon-gun.
Daughter fool who really cares about her use.

Kim Hwan/ Yoo Youngjae
He is the youngest member of the Kim family, who is a pure and innocent man.
be close to Hongbyeogam

The role of Jo Hwa-jin/ Seorina.
" My dream is to be your highness. "
Before Cheoljong was exiled to Kang Ho-do, he ran into him like fate.
Cheoljong's first love.

Role of Cho daebi/Cho Yeon-hee
" Surviving is winning."
superstitious and obsessed with survival

The role of manbok/ Kim In-kwon
a court cuisine expert
I'm having a hard time because of the so-young that keeps coming in and out of Suragan.
Cooperative relationship with so-young to become close and assist.

The role of Damhyang / Kang Chaewon
a new people in Suragan
She is the youngest maid in Suragan.
Watching all the highlights of episode 1 to 20.
the conclusion of MR. Queen
The material is unique and fun.
I'm looking forward to the ending of the drama.
To start with the conclusion...
The ending of MR. Queen ends with a happy ending.
Cheoljong and so-yong confirm each other's love.
Bong-hwan, who returned to his original body, searched through history books
Make sure Yong and Cheoljong are doing well!!
It ends with my favorite ending.
The last highlights of MR. Queen ending.
Chang Bong-hwan's Fate Changed
https://www.youtube.com/watch?v=DM-5uwmIhUg
the recapture of the throne by King Cheoljong and So-Yong
https://www.youtube.com/watch?v=zUtyW8bSMEg
So-yong asking how Bong-hwan is doing.
https://www.youtube.com/watch?v=BMwkcK4eXuI
Official video of MR. Queen
https://www.youtube.com/watch?v=G0IEwpsR9As